Skip to content

Quality monitoring of wind turbines at the Fécamp offshore wind farm

Following its involvement last year in the manufacturing, installation, commissioning and maintenance stages of France’s first offshore wind farm in Saint-Nazaire, VALEMO is continuing to play an active part in the development of the offshore wind industry in 2023.

As part of the construction of the Fécamp offshore wind farm, VALEMO is providing quality monitoring services for the 71 7MW wind turbines that will equip the site, on behalf of the project developer Eoliennes Offshore des Hautes Falaises.

VALEMO is carrying out these tasks in the port of Cherbourg, where a hub for storing and pre-assembling the wind turbines has been set up.

For our teams, the aim is to ensure that the equipment is compliant, of good quality and in good condition, by carrying out inspections on the 213 sections of mast, the 213 blades and the 71 nacelles of the wind farm before they go to sea. This also involves checking that the 3 sections of each wind turbine mast have been lifted, verticalized and assembled correctly (an operation carried out on the quayside before loading on the ship).

Since March 2023, our teams have been working with the teams from Eoliennes Offshore des Hautes Falaises, Siemens Gamesa Renewable Energy and their subcontractors to ensure that this project meets the highest quality standards.
It is thanks to this collective effort that the first wind turbines were recently loaded on the ship and are currently being installed at sea in July.

Actualités

WATTS.GREEN: First TCMA contract for wind power

Since 1 January 2026, Valemo has been operating the Tigny-Noyelles wind farm on behalf of WATTS.green. Through this technical, administrative, financial and commercial management role, VALEMO applies its expertise and know-how to ensure the performance and long-term viability of this wind farm.
Lire la suite

Saint-Brieuc: Third year of the preventive maintenance programme for offshore wind turbine foundations!

A new campaign, carried out on behalf of RES Services, focusing on the Saint-Brieuc offshore wind farm, operated by Iberdrola. For around one month, our VALEMO teams based in Brittany and Loire-Atlantique carried out operations at sea from the Port of Lézardrieux,
Lire la suite

NEURON by VALEMO: a solution that continues to evolve

More and more of you are choosing and putting our NEURON by VALEMO automation and remote management solution to the test, in both the wind and solar sectors. Thank you for your trust. This year has also been characterised by the desire
Lire la suite
valemo.fr
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.