Skip to content

//Offshore: AKROCEAN continues to expand and develop its fleet of high-speed offshore measuring buoys!

VALEMO supports the start up on an enlarged scope, from commissioning to the installation of buoys and up to the maintenance of the systems and their decommissioning at the end of the campaign. The remote control center at our headquarters in Bègles is used to monitor the proper operation and safety of the installations throughout the pre-validation and commercial campaigns, in France and abroad.
This is a complete and exciting activity for our teams, who also ensure the rigorous application of all QHSE measures related to interventions at sea and the collection of wind data on sites that are sometimes far from the coast and isolated.
A great adventure that continues with enthusiasm alongside AKROCEAN and GEPS TECHNO!

Actualités

Meeting our experts!

Since January, VALEMO has been offering you the opportunity to delve into the heart of our operation and maintenance business by meeting our experts, who have made VALEMO a specialist in the world of renewable energy. Among the experts you can discover:
Lire la suite

Discover the results of our 2023 customer satisfaction survey!

We are pleased to share with you the results of our recent customer satisfaction survey conducted by the Continuous Improvement department. The survey, which was sent to all our customers, attracted a remarkable response rate of 46%, representing 80% of our corporate
Lire la suite

SACDA data analysis.

Since 2018, VALEMO has implemented SCADA data analysis with the aim of optimising wind turbine performance and maintenance. This tool identifies various faults, such as an anemometer or temperature anomaly, underperformance, PLC wind drift, misalignment, as well as cooling and lubrication issues.
Lire la suite