Skip to content

A new group of wind farms in Occitanie under VALEMO management

Between mid-2024 and early 2025, VALEMO has begun operating four new wind farms in the Occitanie region: Saint-Amans, Valtoret, Cuxac and Amoures. These wind farms, built in 2024, mark a new stage in the development of our activities in this dynamic region.

The first year following commissioning is a crucial phase for the local integration of the assets and the adjustments required for optimum performance. During this period, VALEMO confirms its commitment to rigorous and responsible management of renewable energy infrastructures.

With this new group of parks, VALEMO affirms its key role in the operation of assets in Occitanie, continuing our mission to support the energy transition in collaboration with local territories.

The challenges of this new management

  • Local collaboration: These projects strengthen our ties with local partners and communities, fostering greater acceptability and a positive impact on communities.
  • CSR commitment: By managing these assets, VALEMO actively contributes to the production of green and responsible energy.
  • Reliability and optimization: Our teams ensure the implementation of best practices to optimize production and guarantee the sustainability of equipment.

Actualités

Managing plant shutdowns and restarts during negative price episodes

Yes, VALEMO is able to take the place of aggregators for the shutdown and restart of your renewable energy installations during periods of negative prices. In a context where negative prices on electricity markets are becoming an increasingly frequent reality year after
Lire la suite

VALEMO supports EOLE STAB in the development of an innovative floating wind turbine

VALEMO is supporting EOLE STAB in its 1/10-scale prototype project for a floating wind turbine, which aims to validate an innovative, patented solution based on an annular concrete caisson topped by an openwork mast with low wave drag. This innovative technology, featuring
Lire la suite

Monitoring icing episodes in Finland

At the end of 2024, after two years of construction, the VIIATTI wind farm, supported by the VALOREM Group, will be completed. The project comprises two wind farms in Finland, Kalistanneva and Matkussaari, operated by VALEMO. With a total capacity of 313.5
Lire la suite