VALEMO’s drone activity – objectives and uses

For almost a year now, VALEMO has been integrating drone telepilot skills with the aim of being able to carry out high-quality aerial inspections and access difficult or dangerous areas without endangering inspectors.

Four technical experts were trained in the spring of 2023 on several types of drones over a three-week period. Alongside this practical training, these four experts prepared and then validated the Certificat d’Aptitude Théorique de Télépilote.

VALEMO has chosen to equip itself with top-quality equipment in order to provide high value-added services. Our remote pilots use a DJI M350 RTK drone equipped with a P1 camera and an H20T thermal camera.

Drone DJI M350 RTK

The uses identified include

  • Visual inspections of blades, nacelles, towers and foundations for onshore and offshore wind turbines.
  • Thermographic inspections of photovoltaic power plant panels.
  • Electrical continuity measurement of wind turbine lightning protection systems.
  • Thermographic inspections of structures (wind turbine blades and tower sections in particular).

This year, our remote pilots will have flown a total of over 80 hours on some fifteen projects representing more than 60 wind turbines in mainland France.

Actualités

VALEMO strengthens its offshore expertise with the supervision the Yeu-Noirmoutier offshore wind farm

[ PRESS RELEASE ] Bègles, July 15, 2025 VALEMO, a specialist in the operation and maintenance of renewable energy, announces the signing of a contract with EMYN (Eoliennes en mer des Îles d’Yeu et de Noirmoutier), a subsidiary of Ocean Winds (the
Lire la suite

Fire detectors: a VALEMO solution to comply with regulations

Since 2020, ICPE regulations have extended the obligation to install a fire detection system to all wind turbines commissioned before 2012. Although some turbine manufacturers do have solutions, they are often costly and unreliable, with the risk of untimely shutdowns due to
Lire la suite

A team dedicated to quality for GE Vernova offshore wind turbines

VALEMO has just started a quality inspection mission on behalf of GE Vernova as part of the Dogger Bank offshore wind project, one of the largest offshore wind farms in the world, located in the North Sea and equipped with 190 GE
Lire la suite
valemo.fr
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.