Skip to content

Thermography of PV modules by drone at VALEMO

Thanks to drone data acquisition by VALEMO technicians and the use of an advanced analysis platform, the performance of photovoltaic power plants can be optimized over the long term.

Rigorous methodology for reliable results

Our drone inspection process is based on several key steps:

  1. Preliminary analysis: study of the technical context and the customer’s specific needs, integration of plans and verification of the regulatory framework governing the flight.
  2. Flight parameterization: precise definition of parameters to ensure optimum coverage.
  3. Inspection: systematic quality control of collected data to ensure completeness and image clarity.
  4. Data processing: transfer to our specialized analysis platform to create a digital twin of the power plant.
  5. Defect identification and prioritization: automatic characterization by algorithm, verification by an expert, then classification according to severity and impact on performance.
  6. Results: delivery of a detailed summary report, providing a clear, usable overview of the anomalies detected.

The benefits of our approach

  • Fast, efficient geographic coverage
  • Easy access and safety
  • Precise fault detection according to industry standards (IEC TS 62446-3)
  • Detailed geo-referenced data that can be traced over time

Anticipating under-performance means that minor faults can be rectified quickly, reducing downtime and optimizing production.

Examples of faults detected

Shade detection

Hot spot detection

Vegetation shading

Open chain

Why us?

At VALEMO, our technicians specialized in renewable energies guarantee high-quality inspections and diagnostics, thanks to their mastery of market technologies and their expertise in control and electricity. With 15 bases across the country, we ensure optimum responsiveness close to the installations.

Actualités

VALEMO strengthens its offshore expertise with the supervision the Yeu-Noirmoutier offshore wind farm

[ PRESS RELEASE ] Bègles, July 15, 2025 VALEMO, a specialist in the operation and maintenance of renewable energy, announces the signing of a contract with EMYN (Eoliennes en mer des Îles d’Yeu et de Noirmoutier), a subsidiary of Ocean Winds (the
Lire la suite

Fire detectors: a VALEMO solution to comply with regulations

Since 2020, ICPE regulations have extended the obligation to install a fire detection system to all wind turbines commissioned before 2012. Although some turbine manufacturers do have solutions, they are often costly and unreliable, with the risk of untimely shutdowns due to
Lire la suite

A team dedicated to quality for GE Vernova offshore wind turbines

VALEMO has just started a quality inspection mission on behalf of GE Vernova as part of the Dogger Bank offshore wind project, one of the largest offshore wind farms in the world, located in the North Sea and equipped with 190 GE
Lire la suite
valemo.fr
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.