Since the beginning of this year, VALEMO’s offshore team has been working on a new mission: we are providing technical support to e-BO Enterprises to ensure the commissioning and smooth operation of the communications infrastructure for the Dieppe-Le Tréport and Yeu-Noirmoutier offshore wind farm projects, developed by Les Eoliennes en Mer Services.
This mission began on the offshore electrical substation (OSS) of Dieppe-Le Tréport project, being manufactured at the Chantiers de l’Atlantique industrial site in Saint-Nazaire, France, where equipment has been installed and will ensure continuous communications between the offshore site and land.
It will now continue on the wind turbines towers of the Yeu-Noirmoutier project, that are currently in pre-assembly on the Saint-Nazaire harbour logistic hub, prior to their load-out on the offshore installation vessel.
Our works cover several key stages:
- Inspection and verification of integrated communications systems, in collaboration with Tier 1 suppliers;
- Inspection of cabling and connections, for both low-voltage and optical fibers cables;
- Pre-commissioning: testing sensors, interfacing communications systems and validating performance before commissioning;
- Troubleshooting: diagnosing and resolving technical problems to ensure operational continuity.
This expertise helps to ensure that installations operate smoothly right from the integration phase, contributing directly to the efficiency and sustainability of the parks.
Special thanks to our customer e-BO Enterprises for its trust, to Chantiers de l’Atlantique for its warm welcome and the quality of our on-site collaboration, and to Siemens Gamesa for their upcoming welcome on their logistic hub.