Blade fault analysis: 10 years of expertise on 50 wind turbines

In the summer of 2024, our technical audit experts carried out an in-depth study of blade defects identified on a fleet of 10 wind farm projects comprising a total of 50 wind turbines. To carry out this study, a tool was developed to analyze all the defects observed during blade inspections carried out on site by our technical support staff over the last ten years, so as to be able to compare projects with a view to identifying abnormal trends.

Figure 1 – View of all defects classified by severity and temporal evolution (Tool developed by VALEMO)

The aim of this study was to analyze the importance and evolution of defects classified into 3 main categories: erosion, structure, lightning.

The results enabled us to determine the order of magnitude of production losses due to erosion problems (see figure below). The measurements also made it possible to precisely identify structural defects, which may be due to a problem with the design of the blade, as well as defects linked to lightning strikes, which may be due to a failure of the lightning protection system, the cause of a significant loss of earnings.

Figure 2 – Production losses due to erosion problems

This study has enabled us to draw up a blade maintenance strategy by linking these different types of defect to the players involved: erosion is more a question of wind turbine operation, while structural and lightning defects are more a question of contractual relations with wind turbine suppliers.

Actualités

VALEMO’s first direct wind farm maintenance contract with an SPV takes shape!

Since May 2024, VALEMO has been maintaining the Criel-sur-Mer wind farm on behalf of SPV Criel Energie. The start of this contract is the fruit of work that began when the wind farm was commissioned in 2011, and has been complemented by
Lire la suite

Cybersecurity at the heart of the supervision center’s concerns.

With the increasing digitalization of critical infrastructures and the multiplication of players as well as data needs, particularly in the energy sector, cyber security stands out as top priority.The implementation of the European directive NIS2 (Network and Information Systems Directive 2), aimed
Lire la suite

VALEMO operates the wind farm with the largest blades in France!

Last June, VALEMO took over operation of the first citizen-owned wind farm in the Nouvelle-Aquitaine region to feature the largest blades in France. The Andilly-Les-Marais wind farm (PEAM), launched in 2017 by the municipality and supported by the ANE!rs17 association and the
Lire la suite